Projects

Smarter building services for every sector

The Aston Group has a proud reputation for providing cost effective, innovative, right first time building services to both the private and public sectors. Our experience and expertise includes services for homes and offices; for factories, universities and schools; for hospitals and laboratories.

Fyfield Road

Renewable Energy

Waltham Forest Housing, Fyfield Road E17: Solar Hot Water System

Our brief was to install a high efficiency solar hot water system within a void dwelling. The dwelling at the time of installation was under major refurbishment, being converted back from a number of bed-sit type units to one large house, giving 5 double bedrooms....

Click to read more

Our brief was to install a high efficiency solar hot water system within a void dwelling.

The dwelling at the time of installation was under major refurbishment, being converted back from a number of bed-sit type units to one large house, giving 5 double bedrooms.

The new solar system was to be linked to a new boiler / heating system which had recently been installed. The system was designed to give the maximum return by way of reduced cost hot water to the end user.

Procurement

Works was secured after competitive quotations had been submitted by a number of contractors, all the contractors who were invited to summit costs were chosen due to their ongoing working relationship with Waltham Forest Housing.

Our quotation was accepted not only for best valve but also for our detailed design proposals.

Equipment

Vaillant Ltd were the chosen manufacturer due to the new heating boiler being supplied by the same company they also have a range of Solar un-vented hot water cylinders, thus keeping the whole project with one main manufacturer. This will help with any future maintenance.

Supply chain

All equipment was supplied from local merchants, reducing the impact on the environment due to transportation. This also helps to support local business and their employees.

System Benefits

  • Environment ~ Using solar energy, you are reducing the impact on the environment as a whole, the estimated carbon reduction could be as much as 325Kg / per year.
  • The reduced use of standard methods of heating your hot water, helps to conserve the rapidly diminishing supplies of gas and oil, thus helping to curb the every rising cost of standard fuels.
  • End user ~ Once installed the solar system should provide around 50-60% of the annual domestic hot water requirements, in some cases your standard gas boiler would not be required for hot water for some of the summer months.
  • Along with the feel good factor of helping the environment, solar systems will of course save you money. This amount will depend on the fuel type you are replacing.

Maintenance ~ These costs are normally very low, most panels will only need to be visually checked yearly, with a more in-depth service every 3-5 years.

Queensland Road IMAGE

Housing

Queensland Road: A complete building services solution for over 354 new homes

Queensland Road is the final housing phase of the Arsenal Regeneration Area. Located next to Emirates Stadium, Queensland Road provides over 700 new homes with 354 being affordable. The large number of affordable homes at Queensland Road makes it the biggest single development project in the Arsenal Regeneration Area....

Click to read more

Queensland Road is the final housing phase of the Arsenal Regeneration Area.

Located next to Emirates Stadium, Queensland Road provides over 700 new homes with 354 being affordable. The large number of affordable homes at Queensland Road makes it the biggest single development project in the Arsenal Regeneration Area.

Appointed by our long-term partners Kier we began work in 2011 and completed on time at the end of 2013.

The contract included the Design, Installation of the complete Mechanical Services, including:

  • Heating, hot and cold water services,
  • Ventilation
  • Booster pumps
  • BMS Control System
Godfrey House

Commercial

London Borough of Islington: Complete replacement of basement communal heating plant serving circa 350 dwellings.

Godfrey House, St. Luke’s Estate Communal Plant Refurbishment...

Click to read more

Godfrey House, St. Luke’s Estate Communal Plant Refurbishment

Ascham Homes IMAGE2

Facilities Management

Waltham Forest Housing: Managing all planned and reactive maintenance for circa 9,000 dwellings

Aston Group provides a broad range of maintenance services for circa 9,000 dwellings on behalf on Waltham Forest Housing to improve their tenant experience. Scheduled ‘planned’ maintenance is complemented by reactive repairs handled by our Response Call Centre, which deals with all resident liaison, from initiating repairs (such as lift breakdowns, power outages, boiler breakdowns etc),... View Artic...

Click to read more

Aston Group provides a broad range of maintenance services for circa 9,000 dwellings on behalf on Waltham Forest Housing to improve their tenant experience.

Scheduled ‘planned’ maintenance is complemented by reactive repairs handled by our Response Call Centre, which deals with all resident liaison, from initiating repairs (such as lift breakdowns, power outages, boiler breakdowns etc), keeping residents fully informed at all times.

Core work is allocated to operatives and managed to effective completion via PDAs, which are carried by all operatives.

All maintenance is carried out by fully trained Aston Group employees supported by a list of approved high performing specialist suppliers / supply chain subcontractors handpicked by us for their expertise.

Management information systems track the performance against an array of stringent KPIs to maintain the highest standards and our approved supplier list is constantly vetted to drive continuous improvement.

Complete M&E Maintenance and Capital Upgrade Programme including:

  • New / Replacement Central Heating Systems,
  • Boiler Changes, Repairs
  • CHP Servicing, repairs and maintenance
  • Communal Heating for residents and leaseholders
  • Communal Electrics
  • Communal Ventilation
  • Sheltered Accommodation service and Maintenance.
  • Lifts
  • Door Entry
  • Intruder Alarms
  • Smoke Alarms
  • TV Aerials
  • Lightning Protection
  • Renewable Energy
  • Emergency Lighting
  • Domestic and Communal Periodics

Performance against KPIs 2013/14:

  • Gas servicing of dwellings ~ 100% compliance
  • Completion of Repairs & Breakdowns within Target ~ 99.68%
  • Appointments made and kept ~ 99.98%
  • Resident satisfaction (services) ~ 98%
  • Resident satisfaction (repairs) ~ 98.2%
Royal college of surgeons

Healthcare

Royal College of Surgeons

Mechanical Services to newly formed mock Operating Theatres comprising heating, air conditioning and medical gas services...

Click to read more

Mechanical Services to newly formed mock Operating Theatres comprising heating, air conditioning and medical gas services

UCL IMAGE4

Education

University College London: Complex installations and maintenance to numerous education, research facilities and student accommodation.

We have been working as a main contractor with UCL for over 10 years providing new installations and regular maintenance across some 180 buildings, managed from our Central London office. As a globally renowned University, UCL demand only the best and many of our contracts are not only highly complex, they have to be carried out with the minimum of disruption so that buildings may remain operational at all times enabling their world leading research and education to carry on unabated....

Click to read more

We have been working as a main contractor with UCL for over 10 years providing new installations and regular maintenance across some 180 buildings, managed from our Central London office.

As a globally renowned University, UCL demand only the best and many of our contracts are not only highly complex, they have to be carried out with the minimum of disruption so that buildings may remain operational at all times enabling their world leading research and education to carry on unabated.

A typical contract will involve:

  • Removal and replacement of existing Boiler Plant
  • Upgrade of Heating Services
  • New Building Energy Management Systems
  • Electrical Works
  • Building Work
  • Ventilation and Air Conditioning Systems
  • Water Hygiene Improvements

We attend regular Performance meetings and provide monthly reports to ensure that UCL can monitor progress on site and ensure that quality standards are met.

Throughout our time of working with UCL providing Installation, Service, Repairs and Maintenance, there have been no instances where there has been a failure to complete works on time or on budget.